IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

441

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0608 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,322 $0 n/a
MZ0351 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $72,794 $24,018 n/a
MZ0351 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,304 $0 n/a
MZ0351 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,579 $16,300 n/a
MZ0351 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,603 $3,000 n/a
MZ0351 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $42,244 $83,200 n/a
MZ0351 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,137 $23,955 n/a
MZ0351 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,019 $814 n/a
MZ0351 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $640 n/a
NL0085 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,711 $26,296 n/a
NL0085 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $808 $25 n/a
NL0085 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $525 n/a
NL0085 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $50,849 $76,500 n/a
NL0085 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,403 $10,178 n/a
SF0558 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $591 Implemented
SF0558 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $98,999 $34,416 Implemented
SF0558 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,759 $2,995 Implemented
SF0558 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $282 $379 Implemented
SF0558 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $0 Implemented
SF0558 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,186 $525 Not Implemented
SF0558 # 10 Y:2020 10 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $9,006 $75,000 Not Implemented
SF0558 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,252 $4,542 Implemented
SF0558 # 07 Y:2020 07 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $30,342 $50,211 Not Implemented
SF0558 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,149 $6,701 Not Implemented
GT0949 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $1,392 $5,106 Not Implemented