IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 311911 Roasted Nuts and Peanut Butter Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0386 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,553 $40,720 Not Implemented
SF0386 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $5,315 $18,821 Not Implemented
SF0386 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217 $461 Not Implemented
SD0416 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,133 $35,628 Implemented
SD0416 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,893 $5,295 Implemented
SD0416 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $3,458 $4,950 Implemented
SD0416 # 04 Y:2009 04 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,586 $26,000 Not Implemented
SD0416 # 05 Y:2009 05 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $655 $0 Implemented
SD0416 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $0 Implemented
SF0273 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,765 $300 Implemented
SF0273 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,656 $480 Implemented
SF0273 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,380 $8,846 Not Implemented
SF0273 # 04 Y:2003 04 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $106,094 $76,555 Not Implemented
SF0273 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,201 $7,700 Not Implemented
SF0273 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $728 $728 Implemented
SF0273 # 07 Y:2003 07 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $946 $1,286 Not Implemented
SF0273 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,828 $60,000 Not Implemented
SF0273 # 09 Y:2003 09 2003 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,493 $15,750 Not Implemented
SF0273 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,103 $13,336 Implemented
SF0273 # 11 Y:2003 11 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,386 $1,395 Not Implemented
SF0273 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,355 $84,428 Implemented
SF0273 # 13 Y:2003 13 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,475 $72,000 Not Implemented
SF0273 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $3,232 $17,400 Implemented
SF0273 # 15 Y:2003 15 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $810 $0 Not Implemented
SF0273 # 16 Y:2003 16 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $7,467 $6,400 Not Implemented