IAC logo
IAC Assessment: SF0386
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0386
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2010
Principal Product Pistachios
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 82,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 4,992
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,055 2,771,127 kWh $0.08
Electricity Demand $75,779 7,766 kW-months/year $9.76
Electricity Fees $(-38,933) - $ -
Natural Gas $204,925 26,155 MMBtu $7.84
TOTAL ENERGY COSTS $449,826
RECOMMENDED SAVINGS* $41,047 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$10,471
Cost:
-
$943 12,567 - - $9,528 1,217 $943
12,567
kWh
-
-
kW-months/year
$9,528
1,217
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,307
Cost:
$3,738
$2,700 35,958 $1,607 172 - - $2,700
35,958
kWh
$1,607
172
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,677
Cost:
$1,600
$1,290 17,174 $387 41 - - $1,290
17,174
kWh
$387
41
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,507
Cost:
$7,500
$3,280 43,680 $1,687 180 $(-1,460) (-186) $3,280
43,680
kWh
$1,687
180
kW-months/year
$(-1,460)
(-186)
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,553
Cost:
$40,720
$9,047 120,460 $6,506 695 - - $9,047
120,460
kWh
$6,506
695
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,315
Cost:
$18,821
$4,450 59,259 $865 92 - - $4,450
59,259
kWh
$865
92
kW-months/year
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$217
Cost:
$461
$217 2,217 - - - - $217
2,217
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$41,047
Cost:
$72,840
$21,927 291,315 $11,052 1,180 $8,068 1,031 $21,927
291,315
kWh
$11,052
1,180
kW-months/year
$8,068
1,031
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas