IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

192

matching recommendations
Reset
NAICS 311911 Roasted Nuts and Peanut Butter Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0431 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $808 $0 Not Implemented
UF0431 # 08 Y:2010 08 2010 UPGRADE CONTROLS ON COMPRESSORS $1,346 $0 Not Implemented
UF0431 # 09 Y:2010 09 2010 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,815 $0 Not Implemented
OK0783 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $29,321 $280,000 Not Implemented
OK0783 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $887 Implemented
OK0783 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $775 Implemented
OK0783 # 04 Y:2009 04 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,327 $26,066 Not Implemented
OK0783 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,219 $15,039 Not Implemented
OK0783 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,392 $67,320 Not Implemented
OK0783 # 07 Y:2009 07 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $18,978 $3,810 Implemented
OK0783 # 08 Y:2009 08 2009 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $50,901 $15,708 Implemented
OK0783 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,399 $0 Implemented
SD0416 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,133 $35,628 Implemented
SD0416 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,893 $5,295 Implemented
SD0416 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $3,458 $4,950 Implemented
SD0416 # 04 Y:2009 04 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,586 $26,000 Not Implemented
SD0416 # 05 Y:2009 05 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $655 $0 Implemented
SD0416 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $0 Implemented
GT0860 # 01 Y:2009 01 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $10,513 $6,050 Implemented
GT0860 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,661 $1,000 Implemented
GT0860 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $1,000 Implemented
GT0860 # 04 Y:2009 04 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,140 $6,750 Not Implemented
GT0860 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,419 $7,066 Implemented
GT0860 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,213 $12,000 Not Implemented
GT0860 # 07 Y:2009 07 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,199 $4,250 Not Implemented