Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
265
matching recommendationsNAICS | 311919 | Other Snack Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0321 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $7,389 | $352 | n/a |
IC0321 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $1,211 | n/a |
IC0321 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $93,480 | $390,298 | n/a |
IC0321 # 06 Y:2025 | 06 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,206 | $5,047 | n/a |
IC0321 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $19,153 | $1,152 | n/a |
IC0321 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $693 | $644 | n/a |
IC0321 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $1,774 | n/a |
IC0321 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $2,006 | $701 | n/a |
IC0321 # 10 Y:2025 | 10 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,444 | $0 | n/a |
IC0321 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $706 | $565 | n/a |
IC0321 # 04 Y:2025 | 04 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,867 | $0 | n/a |
UU0257 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,024 | $16,577 | n/a |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | n/a |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | n/a |
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | n/a |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | n/a |
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | Not Implemented |
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,000 | Implemented |
UD1070 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,634 | $704,952 | Not Implemented |
UD1070 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,729 | $2,893 | Not Implemented |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $1,000 | Implemented |
MZ0351 # 08 Y:2023 | 08 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $42,244 | $83,200 | Not Implemented |
MZ0351 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $72,794 | $24,018 | Not Implemented |
MZ0351 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,304 | $0 | Not Implemented |
MZ0351 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,019 | $814 | Not Implemented |