IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
NAICS 311920 Coffee and Tea Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0252 # 01 Y:2025 01 2025 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,602 $0 n/a
DL0252 # 07 Y:2025 07 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $657 $1,000 n/a
DL0252 # 04 Y:2025 04 2025 UPGRADE CONTROLS ON COMPRESSORS $8,172 $9,000 n/a
DL0252 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,945 $9,000 n/a
DL0252 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,540 $1,500 n/a
DL0252 # 03 Y:2025 03 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $28,847 $27,000 n/a
DL0252 # 02 Y:2025 02 2025 REDUCE VENTILATION AIR $4,684 $1,500 n/a
UW2417 # 03 Y:2024 03 2024 UPGRADE OBSOLETE EQUIPMENT $173,547 $209,363 n/a
UW2417 # 01 Y:2024 01 2024 MAKE A NEW BY-PRODUCT $17,325 $26,750 n/a
UW2417 # 02 Y:2024 02 2024 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $11,904 $47,500 n/a
LS2412 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $150 Not Implemented
LS2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $872 $135 Implemented
LS2412 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,908 $275 Not Implemented
LS2412 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $5,915 Implemented
LS2411 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $45 Implemented
LS2411 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,595 $50 Not Implemented
LS2411 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $72,136 $480,000 Implemented
LS2411 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,962 $12,050 Implemented
LS2411 # 03 Y:2024 03 2024 IMPROVE SPACE COMFORT CONDITIONING $26,395 $18,900 Not Implemented
LS2402 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $35,595 $0 Implemented
LS2402 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,573 $125 Implemented
LS2402 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $5,000 $12,500 Implemented
UA0277 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,286 $3,921 Not Implemented
UA0277 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $3,523 $4,208 Not Implemented
UA0277 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,464 $8,591 Not Implemented