IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 31193 Flavoring Syrup and Concentrate Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0294 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,276 $1,797 Implemented
IC0294 # 05 Y:2024 05 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,982 $44,890 Not Implemented
IC0294 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,704 $5,717 Not Implemented
IC0294 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $979 $608 Implemented
IC0294 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,597 $3,641 Implemented
IC0294 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,901 $233,678 Not Implemented
IC0200 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $2,210 Not Implemented
IC0200 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $1,524 $2,139 Not Implemented
IC0200 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $3,131 Not Implemented
IC0200 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $2,230 Not Implemented
IC0200 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,321 $1,626 Not Implemented
IC0200 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $30 Not Implemented
IC0125 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $202,850 $475,200 Not Implemented
IC0125 # 12 Y:2007 12 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,563 $0 Implemented
IC0125 # 11 Y:2007 11 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,961 $16,278 Implemented
IC0125 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,975 $14,767 Not Implemented
IC0125 # 09 Y:2007 09 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,577 $43,780 Implemented
IC0125 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $12,731 $18,755 Not Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented
IC0125 # 06 Y:2007 06 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,910 $4,260 Not Implemented
IC0125 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $0 Not Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 03 Y:2007 03 2007 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $227,690 $372,000 Not Implemented
IC0125 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $305,019 $900,000 Not Implemented