IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 311941 Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0712 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $827 $1,200 Implemented
MA0712 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $323 $750 Implemented
MA0712 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $853 $2,930 Not Implemented
MA0712 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $13,420 $65,327 Implemented
MA0712 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,863 $12,000 Implemented
MA0712 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $938 $2,930 Not Implemented
MA0712 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,311 $5,000 Implemented
MA0712 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,440 $4,200 Not Implemented
BS0016 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $184 Implemented
BS0016 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,648 $1,185 Not Implemented
BS0016 # 05 Y:2013 05 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,127 $6,826 Not Implemented
BS0016 # 04 Y:2013 04 2013 COVER OPEN TANKS $4,197 $1,600 Implemented
BS0016 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $437 $604 Implemented
BS0016 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $15,856 $27,630 Implemented
SD0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,833 $1,900 Not Implemented
SD0450 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,297 $3,550 Not Implemented
SD0450 # 01 Y:2012 01 2012 USE MINIMUM STEAM OPERATING PRESSURE $8,111 $200 Not Implemented
SD0450 # 05 Y:2012 05 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,500 $25,000 Not Implemented
SD0450 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,795 $200 Not Implemented
SD0436 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $7,888 $6,050 Implemented
SD0436 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,598 $52,274 Implemented
SD0436 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,198 $2,100 Implemented
SD0436 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,180 $2,000 Implemented
SD0436 # 08 Y:2011 08 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $283,465 $607,200 Not Implemented
SD0436 # 07 Y:2011 07 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $12,828 $20,000 Implemented