matching recommendationsNAICS | 31199 | All Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0930 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $11,220 | $2,763 | Implemented |
GT0930 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,062 | $3,500 | Implemented |
GT0930 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,531 | $8,066 | Implemented |
GT0930 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $479 | $463 | Implemented |
GT0930 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,746 | $1,755 | Implemented |
GT0930 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,093 | $2,092 | Not Implemented |
GT0930 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,081 | $2,100 | Implemented |
GT0930 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $3,500 | Implemented |
GT0930 # 09 Y:2019 | 09 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,647 | $154,353 | Not Implemented |
GT0929 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,816 | $32,516 | Implemented |
GT0929 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $720 | $2,415 | Not Implemented |
GT0929 # 03 Y:2019 | 03 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,344 | $740,232 | Not Implemented |
GT0929 # 04 Y:2019 | 04 | 2019 | USE SOLAR HEAT TO HEAT WATER | $60,997 | $1,000,000 | Not Implemented |
GT0929 # 05 Y:2019 | 05 | 2019 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,348 | $8,500 | Not Implemented |
UF0529 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $109,260 | $320,000 | Implemented |
UF0529 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $67,747 | $55,000 | Implemented |
UF0529 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,180 | $25,340 | Implemented |
UF0529 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,645 | $10,000 | Implemented |
UF0529 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $11,158 | $9,464 | Implemented |
UF0529 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,139 | $10,000 | Implemented |
UF0529 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,882 | $2,800 | Implemented |
UF0529 # 08 Y:2019 | 08 | 2019 | REDUCE OR ELIMINATE WASTE | $24,322 | $15,000 | Not Implemented |
BS0120 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,949 | $2,100 | Not Implemented |
BS0120 # 02 Y:2019 | 02 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,165 | $4,875 | Not Implemented |
BS0120 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,195 | $210 | Not Implemented |