Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
712
matching recommendationsNAICS | 31199 | All Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0684 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $920 | $2,600 | Not Implemented |
CO0684 # 03 Y:2014 | 03 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $28,690 | $96,370 | Not Implemented |
CO0684 # 04 Y:2014 | 04 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,790 | $1,500 | Implemented |
SF0443 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $169,599 | $40,264 | Implemented |
SF0443 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,241 | $840 | Not Implemented |
SF0443 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,931 | $0 | Not Implemented |
SF0443 # 04 Y:2014 | 04 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $21,679 | $25,614 | Implemented |
SF0443 # 05 Y:2014 | 05 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,826 | $69,335 | Not Implemented |
SF0443 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,897 | $24,840 | Not Implemented |
SF0443 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,886 | $16,744 | Not Implemented |
SF0443 # 08 Y:2014 | 08 | 2014 | INSULATE BARE EQUIPMENT | $9,060 | $45,537 | Not Implemented |
SF0443 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $63,378 | $31,000 | Implemented |
SF0443 # 10 Y:2014 | 10 | 2014 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $11,793 | $50,140 | Not Implemented |
SF0443 # 11 Y:2014 | 11 | 2014 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,869 | $444,663 | Not Implemented |
OK0870 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,384 | $0 | Implemented |
OK0870 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,957 | $0 | Implemented |
OK0870 # 03 Y:2013 | 03 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,212 | $2,500 | Not Implemented |
OK0870 # 04 Y:2013 | 04 | 2013 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $20,022 | $105,120 | Not Implemented |
BS0020 # 01 Y:2013 | 01 | 2013 | REDESIGN PROCESS | $15,024 | $15,359 | Not Implemented |
BS0020 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $18,318 | $19,262 | Implemented |
BS0020 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,893 | $71,307 | Implemented |
BS0020 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,831 | $15,600 | Implemented |
BS0020 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $9,887 | $5,300 | Implemented |
BS0020 # 06 Y:2013 | 06 | 2013 | COVER OPEN TANKS | $3,845 | $6,050 | Not Implemented |
TT0114 # 01 Y:2013 | 01 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,820 | $0 | Implemented |