IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 31199 All Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0042 # 03 Y:2022 03 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,544 $6,243 n/a
TR0042 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $33,568 $395,038 n/a
TR0042 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $141 $52 n/a
NT0005 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $4,433 $9,008 Not Implemented
NT0005 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,375 $6,539 Not Implemented
NT0005 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $832,000 $100,000 Not Implemented
NT0005 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $6,240 $0 Not Implemented
NT0005 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,885 $1,258 Not Implemented
NT0005 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,810 $0 Not Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
TA0127 # 03 Y:2006 03 2006 INSTALL REPLACEMENT DOORS $285 $486 Not Implemented
TA0127 # 01 Y:2006 01 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,212 $0 Implemented
TA0127 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,752 $0 Implemented
TA0127 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $625 $100 Implemented
TA0127 # 05 Y:2006 05 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $60 $93 Not Implemented
AM0511 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $3,600 $2,440 Not Implemented
AM0511 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $2,665 $0 Not Implemented
AM0511 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $640 Not Implemented
AM0511 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $150 Implemented
AM0511 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,150 $15 Not Implemented
AM0511 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $18,600 $59,000 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented