IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
NAICS 311991 Perishable Prepared Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0406 # 11 Y:2012 11 2012 INSTALL TURBULATORS $772 $1,500 Implemented
BD0406 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $434 $150 Not Implemented
BD0406 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $254 $10 Implemented
BD0406 # 14 Y:2012 14 2012 RECOVER AND REUSE COOLING WATER $15,696 $2,200 Not Implemented
MAS014 # 01 Y:2011 01 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $47,869 $10,650 Not Implemented
MAS014 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,371 $17,325 Not Implemented
MAS014 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,256 $8,190 Not Implemented
MAS014 # 04 Y:2011 04 2011 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,288 $2,070 Not Implemented
MAS014 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,033 $200 Not Implemented
MAS014 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $700 Not Implemented
MAS014 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $200 Not Implemented
OK0778 # 01 Y:2009 01 2009 $171,482 $47,731 Implemented
OK0778 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,464 $1,266 Implemented
OK0778 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,933 $525 Implemented
OK0778 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,111 $5,417 Implemented
OK0778 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $412 $0 Implemented
MI0155 # 01 Y:2007 01 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $66,401 $120,000 Not Implemented
MI0155 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $51,399 $22,558 Not Implemented
MI0155 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,061 $2,665 Not Implemented
MI0155 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,549 $23,640 Not Implemented
MI0155 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,901 $27,300 Not Implemented
MI0155 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,760 $1,074 Not Implemented
MI0155 # 07 Y:2007 07 2007 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,524 $7,800 Not Implemented
MI0155 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,179 $30 Not Implemented
MI0155 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,909 $180 Not Implemented