Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
500
matching recommendationsNAICS | 311999 | All Other Miscellaneous Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0088 # 01 Y:2017 | 01 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $3,195 | $10 | Not Implemented |
IP0088 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,435 | $0 | Not Implemented |
IP0088 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,562 | $3 | Implemented |
IP0088 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,220 | $120 | Not Implemented |
IP0088 # 05 Y:2017 | 05 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $1,266 | $100 | Not Implemented |
IP0088 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $558 | $90 | Implemented |
IP0088 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,505 | $580 | Not Implemented |
IP0088 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $945 | $750 | Implemented |
IP0088 # 09 Y:2017 | 09 | 2017 | OPTIMIZE PLANT POWER FACTOR | $2,569 | $1,746 | Not Implemented |
IP0088 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $6,175 | $5,000 | Not Implemented |
IP0088 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,470 | $8,388 | Not Implemented |
IP0088 # 12 Y:2017 | 12 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $394 | $871 | Not Implemented |
IP0088 # 13 Y:2017 | 13 | 2017 | INSULATE BARE EQUIPMENT | $1,125 | $2,464 | Not Implemented |
SD0491 # 01 Y:2014 | 01 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,862 | $5,500 | Not Implemented |
SD0491 # 02 Y:2014 | 02 | 2014 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,726 | $194 | Not Implemented |
SD0491 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $924 | $3,450 | Not Implemented |
SD0491 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $609 | $957 | Not Implemented |
SD0491 # 05 Y:2014 | 05 | 2014 | USE PHOTOCELL CONTROLS | $445 | $555 | Not Implemented |
SD0491 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $310 | $200 | Implemented |
CO0684 # 01 Y:2014 | 01 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,830 | $3,600 | Not Implemented |
CO0684 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $920 | $2,600 | Not Implemented |
CO0684 # 03 Y:2014 | 03 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $28,690 | $96,370 | Not Implemented |
CO0684 # 04 Y:2014 | 04 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,790 | $1,500 | Implemented |
SF0443 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $169,599 | $40,264 | Implemented |
SF0443 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,241 | $840 | Not Implemented |