Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0575 # 07 Y:2024 07 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $83,526 $121,547 n/a
LE0575 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,906 $7,700 n/a
LE0575 # 02 Y:2024 02 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $6,164 $100 n/a
LE0575 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,173 $100 n/a
LE0575 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118,088 $80,000 n/a
LE0575 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $37,603 $28,720 n/a
LE0575 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,618 $2,720 n/a
LE0575 # 09 Y:2024 09 2024 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $36,513 $150,000 n/a
LE0575 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $242,187 $285,000 n/a
LE0575 # 10 Y:2024 10 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,217 $144,000 n/a
LE0520 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,247 $4,450 Implemented
LE0520 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,006 $35 Not Implemented
LE0520 # 02 Y:2022 02 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,676 $23,000 Not Implemented
LE0520 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,958 $50,000 Not Implemented
DL0188 # 09 Y:2021 09 2021 RECOVER WASTE HEAT FROM EQUIPMENT $7,620 $7,000 Not Implemented
DL0188 # 02 Y:2021 02 2021 METER WASTE WATER $172,100 $3,000 Not Implemented
DL0188 # 03 Y:2021 03 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,050 $9,490 Implemented
DL0188 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,490 $25,000 Implemented
DL0188 # 05 Y:2021 05 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,798 $1,000 Implemented
DL0188 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,320 $8,000 Not Implemented
DL0188 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $900 $0 Implemented
DL0188 # 14 Y:2021 14 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,800 $9,120 Not Implemented
DL0188 # 13 Y:2021 13 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,000 $5,500 Not Implemented
DL0188 # 12 Y:2021 12 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,290 $57,350 Implemented
DL0188 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $20,000 Not Implemented