IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

868

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0483 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,855 $16,147 Implemented
SF0483 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,458 $15,229 Implemented
SF0482 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,467 $0 Implemented
SF0482 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,190 $13,256 Implemented
SF0482 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $4,739 $14,109 Implemented
SU0410 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,079 $0 Implemented
SU0410 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $10,482 $0 Implemented
SU0410 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,089 $0 Implemented
SU0410 # 04 Y:2016 04 2016 DISCONNECT BALLASTS $2,567 $0 Implemented
SU0410 # 05 Y:2016 05 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,472 $1,075 Implemented
SU0410 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,702 $18,890 Implemented
SU0410 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,321 $35,838 Implemented
SU0410 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $145 $265 Implemented
SU0410 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $956 Implemented
MZ0210 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,657 $3,500 Implemented
MZ0210 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $525 Implemented
MZ0210 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,903 $1,150 Implemented
MZ0210 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $1,100 $500 Implemented
MZ0210 # 07 Y:2016 07 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $651 $300 Implemented
DL0157 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $11,140 $0 Implemented
DL0157 # 03 Y:2016 03 2016 TREAT AND REUSE RINSE WATERS $34,545 $41,405 Implemented
DL0157 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,700 $44,740 Implemented
DL0157 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,170 $77,500 Implemented
DL0157 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,440 $46,960 Implemented
SF0477 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,727 $0 Implemented