IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0229 # 03 Y:2023 03 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,945 $3,480 Implemented
UU0229 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,527 $5,600 Implemented
UU0229 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,440 $3,816 Not Implemented
UU0229 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $2,146 $3,060 Implemented
UU0158 # 04 Y:2019 04 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $740 $800 Not Implemented
UU0158 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $306 $260 Implemented
UU0158 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $2,762 Implemented
UU0158 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,811 $160 Not Implemented
UU0158 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $6,933 $50,000 Not Implemented
UU0158 # 06 Y:2019 06 2019 ELIMINATE/REDUCE AN OPERATION $445 $0 Implemented
UU0158 # 05 Y:2019 05 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $451 $1,100 Implemented
UU0143 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,516 $3,140 Implemented
UU0143 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $220 $275 Implemented
UU0143 # 05 Y:2019 05 2019 MINIMIZE WATER USAGE $11,728 $50,000 Not Implemented
UU0143 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,501 $3,184 Not Implemented
UU0143 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $510 $50 Not Implemented
UU0143 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $100 Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
UU0115 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $2,500 Not Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0098 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $2,880 Implemented
UU0098 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $1,000 Implemented
UU0098 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,060 $0 Implemented