IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2003 # 01 Y:2020 01 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,371 $250 Not Implemented
LS1904 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,052 $20,000 Not Implemented
LS1904 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,763 $45,810 Implemented
LS1904 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $20,231 $10,000 Not Implemented
LS1904 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,713 $1,530 Not Implemented
LS1904 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $414,085 $84,000 Not Implemented
LS1904 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,536 $0 Implemented
LS1904 # 01 Y:2019 01 2019 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $0 Implemented
LS1815 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,427 $3,000 Implemented
LS1815 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $261 $788 Not Implemented
LS1815 # 07 Y:2018 07 2018 USE PHOTOCELL CONTROLS $88 $225 Not Implemented
LS1815 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15 $100 Implemented
LS1815 # 04 Y:2018 04 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $146 $125 Implemented
LS1815 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $73 $25 Implemented
LS1815 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,369 $350 Implemented
LS1815 # 01 Y:2018 01 2018 PAY UTILITY BILLS ON TIME $459 $25 Implemented
LS1812 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,243 $13,500 Not Implemented
LS1812 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,886 $17,000 Implemented
LS1812 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $17,980 $20,000 Not Implemented
LS1812 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $50 Not Implemented
LS1810 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $358 $25 Not Implemented
LS1810 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $764 $1,800 Implemented
LS1810 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37 $55 Not Implemented
LS1810 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $1,088 Implemented
LS1810 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $650 $650 Not Implemented