Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,033
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1803 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $228 | $1,800 | Not Implemented |
SD0559 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $534,492 | $1,824,000 | Not Implemented |
SD0559 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $46,211 | $152,126 | Not Implemented |
SD0559 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,481 | $37,900 | Not Implemented |
SD0559 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,884 | $14,697 | Not Implemented |
SD0559 # 05 Y:2018 | 05 | 2018 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,114 | $11,774 | Not Implemented |
SD0559 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,587 | $600 | Not Implemented |
MA0786 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,650 | $11,256 | Not Implemented |
MA0786 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,389 | $13,527 | Not Implemented |
MA0786 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,232 | $1,000 | Implemented |
MA0786 # 04 Y:2018 | 04 | 2018 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $4,126 | $500 | Not Implemented |
MA0786 # 05 Y:2018 | 05 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $542 | $1,820 | Not Implemented |
MA0786 # 06 Y:2018 | 06 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $559 | $360 | Implemented |
OR0696 # 01 Y:2017 | 01 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $179,573 | $3,044 | Not Implemented |
OR0696 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,265 | $37,275 | Not Implemented |
OR0696 # 03 Y:2017 | 03 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,365 | $5,880 | Not Implemented |
OR0696 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $10,116 | Not Implemented |
SF0510 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $494 | $90 | Implemented |
SF0510 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $44,781 | $7,188 | Not Implemented |
SF0510 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,182 | $12,002 | Implemented |
SF0510 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,454 | $9,120 | Implemented |
SF0510 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,192 | $3,095 | Implemented |
SF0510 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,686 | $504,000 | Not Implemented |
SF0509 # 01 Y:2017 | 01 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $2,452 | $0 | Not Implemented |
SF0509 # 02 Y:2017 | 02 | 2017 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $6,821 | $0 | Not Implemented |