Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0958 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $151,488 | $44,117 | Not Implemented |
GT0958 # 04 Y:2021 | 04 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $326 | $200 | Not Implemented |
GT0958 # 01 Y:2021 | 01 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $93,972 | $800 | Implemented |
GT0958 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,743 | $1,850 | Implemented |
GT0958 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $368,765 | $3,913,242 | Not Implemented |
SF0580 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,242 | $2,702 | Implemented |
SF0580 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $228 | $574 | Implemented |
SF0580 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,936 | $49,917 | Implemented |
SF0580 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,463 | $18,200 | Implemented |
SF0580 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,288 | $1,410 | Not Implemented |
SF0580 # 01 Y:2021 | 01 | 2021 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,446 | $0 | Implemented |
SF0580 # 03 Y:2021 | 03 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,715 | $64,882 | Not Implemented |
OR0745 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,286 | $485 | Implemented |
OR0745 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,360 | $542 | Implemented |
UK2107 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $2,733 | $2,931 | n/a |
OR0745 # 01 Y:2021 | 01 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $11,633 | $395 | Implemented |
UK2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,788 | $0 | n/a |
UK2107 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,932 | $3,950 | n/a |
UK2107 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $662 | $150 | n/a |
UK2107 # 04 Y:2021 | 04 | 2021 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,257 | $1,770 | n/a |
UK2107 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,085 | $797 | n/a |
SD0615 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,310 | $6,942 | Implemented |
SD0615 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $385 | $1,182 | Implemented |
SD0615 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $540 | $0 | Implemented |
LS2116 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $4,408 | $250 | Implemented |