Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
969
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1003 # 04 Y:2019 | 04 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,431 | $7,700 | Not Implemented |
OK1003 # 05 Y:2019 | 05 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $10,817 | $1,400 | Implemented |
OK1003 # 06 Y:2019 | 06 | 2019 | PAY UTILITY BILLS ON TIME | $9,631 | $0 | Not Implemented |
OK1003 # 07 Y:2019 | 07 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $48,286 | $9,545 | Implemented |
OK1003 # 08 Y:2019 | 08 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,867 | $4,544 | Not Implemented |
LS1904 # 01 Y:2019 | 01 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $18,805 | $0 | Implemented |
LS1904 # 02 Y:2019 | 02 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,536 | $0 | Implemented |
LS1904 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $414,085 | $84,000 | Not Implemented |
LS1904 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,713 | $1,530 | Not Implemented |
LS1904 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,231 | $10,000 | Not Implemented |
LS1904 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,763 | $45,810 | Implemented |
LS1904 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,052 | $20,000 | Not Implemented |
OK0997 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,994 | $49,087 | Not Implemented |
OK0997 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $17,569 | $1,795 | Implemented |
OK0997 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,052 | $14,332 | Not Implemented |
OK0997 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,415 | $2,668 | Implemented |
OK0997 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,238 | $0 | Implemented |
OK0997 # 06 Y:2019 | 06 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,715 | $1,306 | Implemented |
OK0997 # 07 Y:2019 | 07 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,032 | $0 | Implemented |
OK0997 # 08 Y:2019 | 08 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,875 | $0 | Implemented |
OK0997 # 09 Y:2019 | 09 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $663 | $2,640 | Not Implemented |
OK0997 # 10 Y:2019 | 10 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $366 | $485 | Implemented |
LS1812 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,387 | $50 | Not Implemented |
LS1812 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,980 | $20,000 | Not Implemented |
LS1812 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,886 | $17,000 | Implemented |