IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

969

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0750 # 09 Y:2003 09 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,768 $14,000 Implemented
AS0341 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $6,789 Not Implemented
AS0341 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $834 $891 Not Implemented
AS0341 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $40 Implemented
AS0341 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,287 $260 Implemented
AS0341 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $193 $442 Not Implemented
AS0341 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $20,939 $0 Not Implemented
AS0341 # 07 Y:2003 07 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $23,277 $14,364 Not Implemented
AS0341 # 08 Y:2003 08 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $40,000 $616 Not Implemented
SD0309 # 01 Y:2003 01 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $33,835 $30,000 Not Implemented
SD0309 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,073 $600 Implemented
SD0309 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $5,128 $3,024 Not Implemented
SD0309 # 04 Y:2003 04 2003 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,120 $20,000 Not Implemented
SD0309 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,945 $4,000 Not Implemented
SD0309 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $4,178 $9,500 Not Implemented
SD0309 # 07 Y:2003 07 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,955 $2,263 Implemented
SD0309 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,000 $10,000 Implemented
SD0309 # 09 Y:2003 09 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,820 $14,000 Not Implemented
SD0309 # 10 Y:2003 10 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,200 $2,500 Implemented