Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0575 # 07 Y:2024 | 07 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $83,526 | $121,547 | n/a |
LE0575 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45,906 | $7,700 | n/a |
LE0575 # 02 Y:2024 | 02 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $6,164 | $100 | n/a |
LE0575 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,173 | $100 | n/a |
LE0575 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118,088 | $80,000 | n/a |
LE0575 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $37,603 | $28,720 | n/a |
LE0575 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,618 | $2,720 | n/a |
LE0575 # 09 Y:2024 | 09 | 2024 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $36,513 | $150,000 | n/a |
LE0575 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $242,187 | $285,000 | n/a |
LE0575 # 10 Y:2024 | 10 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $25,217 | $144,000 | n/a |
LE0520 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,247 | $4,450 | Implemented |
LE0520 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,006 | $35 | Not Implemented |
LE0520 # 02 Y:2022 | 02 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,676 | $23,000 | Not Implemented |
LE0520 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,958 | $50,000 | Not Implemented |
DL0188 # 05 Y:2021 | 05 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,798 | $1,000 | Implemented |
DL0188 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $860 | $81,000 | Implemented |
DL0188 # 02 Y:2021 | 02 | 2021 | METER WASTE WATER | $172,100 | $3,000 | Not Implemented |
DL0188 # 03 Y:2021 | 03 | 2021 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,050 | $9,490 | Implemented |
DL0188 # 10 Y:2021 | 10 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,490 | $25,000 | Implemented |
DL0188 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,987 | $20,000 | Not Implemented |
DL0188 # 07 Y:2021 | 07 | 2021 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,320 | $8,000 | Not Implemented |
DL0188 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $900 | $0 | Implemented |
DL0188 # 14 Y:2021 | 14 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,800 | $9,120 | Not Implemented |
DL0188 # 13 Y:2021 | 13 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,000 | $5,500 | Not Implemented |
DL0188 # 12 Y:2021 | 12 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $25,290 | $57,350 | Implemented |