Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0623 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,089 | $5,440 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |
UF0623 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,616 | $0 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
GT0986 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,252 | $1,850 | n/a |
GT0986 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,037 | $800 | n/a |
GT0986 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,353 | $800 | n/a |
GT0986 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,990 | $2,700 | n/a |
GT0986 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $463,303 | $2,451,174 | n/a |
OR0796 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,526 | $1,312,500 | n/a |
OR0796 # 03 Y:2024 | 03 | 2024 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $584 | $2,239 | n/a |
OR0796 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $86,946 | $168,430 | n/a |
OR0796 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $733 | $546 | n/a |
NT0030 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,747 | $1,279 | n/a |
NT0030 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,850 | $0 | n/a |
NT0030 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $60,028 | $83,001 | n/a |
NT0030 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $510 | $0 | n/a |
NT0030 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,406 | $4,553 | n/a |
NT0030 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $82,128 | $10,000 | n/a |
NT0030 # 06 Y:2024 | 06 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $373 | $1,424 | n/a |
LE0575 # 07 Y:2024 | 07 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $83,526 | $121,547 | n/a |