Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0623 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,089 $5,440 n/a
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 n/a
UF0623 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,088 $3,402 n/a
UF0623 # 04 Y:2024 04 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $2,627 $2,343 n/a
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 n/a
UF0623 # 06 Y:2024 06 2024 INSTALL TURBULATORS $979 $3,750 n/a
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 n/a
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 n/a
GT0986 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,252 $1,850 n/a
GT0986 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,037 $800 n/a
GT0986 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,353 $800 n/a
GT0986 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,990 $2,700 n/a
GT0986 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $463,303 $2,451,174 n/a
OR0796 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,526 $1,312,500 n/a
OR0796 # 03 Y:2024 03 2024 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $584 $2,239 n/a
OR0796 # 02 Y:2024 02 2024 ADOPT IN-HOUSE MATERIAL GENERATION $86,946 $168,430 n/a
OR0796 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $733 $546 n/a
NT0030 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,747 $1,279 n/a
NT0030 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $27,850 $0 n/a
NT0030 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $60,028 $83,001 n/a
NT0030 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $510 $0 n/a
NT0030 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,406 $4,553 n/a
NT0030 # 05 Y:2024 05 2024 APPLY FOR INVESTMENT INCENTIVES $82,128 $10,000 n/a
NT0030 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $373 $1,424 n/a
LE0575 # 07 Y:2024 07 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $83,526 $121,547 n/a