Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2024 |
Principal Product | Liquid Beverage Concentrates & Syrups |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 41,000 |
Annual Production | 2,579 Thousand Gallons |
Production Hrs. Annual | 4,750 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $57,824 | 632,424 | kWh | $0.09 |
Electricity Demand | $20,392 | 1,707 | kW-months/year | $11.95 |
Electricity Fees | $8,707 | - | $ | - |
Natural Gas | $22,790 | 2,111 | MMBtu | $10.80 |
TOTAL ENERGY COSTS | $109,713 | |||
RECOMMENDED SAVINGS* | $98,414 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $21,088 Cost: $3,402 |
$4,029 | 44,270 | $17,059 | 1,428 | - | - | - | - |
$4,029 44,270 kWh |
$17,059 1,428 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $11,057 Cost: $4,000 |
- | - | - | - | $11,057 | 1,024 | - | - |
- - kWh |
- - kW-months/year |
$11,057 1,024 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS |
Savings: $4,089 Cost: $5,440 |
$4,089 | 44,944 | - | - | - | - | - | - |
$4,089 44,944 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK |
Savings: $2,627 Cost: $2,343 |
- | - | - | - | $2,627 | 243 | - | - |
- - kWh |
- - kW-months/year |
$2,627 243 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,616 Cost: - |
$1,616 | 17,759 | - | - | - | - | - | - |
$1,616 17,759 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1222 INSTALL TURBULATORS |
Savings: $979 Cost: $3,750 |
- | - | - | - | $979 | 91 | - | - |
- - kWh |
- - kW-months/year |
$979 91 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $958 Cost: $1,400 |
- | - | - | - | $958 | 89 | - | - |
- - kWh |
- - kW-months/year |
$958 89 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $56,000 Cost: $20,720 |
- | - | - | - | - | - | $56,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$56,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,414 Cost: $41,055 |
$9,734 | 106,973 | $17,059 | 1,428 | $15,621 | 1,447 | $56,000 | - | $9,734 106,973 kWh |
$17,059 1,428 kW-months/year |
$15,621 1,447 MMBtu |
$56,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |