IAC Assessment: UF0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Liquid Beverage Concentrates & Syrups
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 41,000
Annual Production 2,579 Thousand Gallons
Production Hrs. Annual 4,750
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,824 632,424 kWh $0.09
Electricity Demand $20,392 1,707 kW-months/year $11.95
Electricity Fees $8,707 - $ -
Natural Gas $22,790 2,111 MMBtu $10.80
TOTAL ENERGY COSTS $109,713
RECOMMENDED SAVINGS* $98,414 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$21,088
Cost:
$3,402
$4,029 44,270 $17,059 1,428 - - - - $4,029
44,270
kWh
$17,059
1,428
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$11,057
Cost:
$4,000
- - - - $11,057 1,024 - - -
-
kWh
-
-
kW-months/year
$11,057
1,024
MMBtu
-
-
$
03: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$4,089
Cost:
$5,440
$4,089 44,944 - - - - - - $4,089
44,944
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$2,627
Cost:
$2,343
- - - - $2,627 243 - - -
-
kWh
-
-
kW-months/year
$2,627
243
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,616
Cost:
-
$1,616 17,759 - - - - - - $1,616
17,759
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1222 INSTALL TURBULATORS Savings:
$979
Cost:
$3,750
- - - - $979 91 - - -
-
kWh
-
-
kW-months/year
$979
91
MMBtu
-
-
$
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$958
Cost:
$1,400
- - - - $958 89 - - -
-
kWh
-
-
kW-months/year
$958
89
MMBtu
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$56,000
Cost:
$20,720
- - - - - - $56,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$56,000
-
$
TOTAL RECOMMENDED Savings:
$98,414
Cost:
$41,055
$9,734 106,973 $17,059 1,428 $15,621 1,447 $56,000 - $9,734
106,973
kWh
$17,059
1,428
kW-months/year
$15,621
1,447
MMBtu
$56,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes