Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0051 # 09 Y:2015 | 09 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $7,963 | $24,900 | Not Implemented |
IP0051 # 08 Y:2015 | 08 | 2015 | OPTIMIZE PLANT POWER FACTOR | $4,646 | $12,637 | Not Implemented |
IP0051 # 01 Y:2015 | 01 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,391 | $27 | Implemented |
IP0051 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,824 | $161 | Implemented |
IP0051 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,313 | $261 | Implemented |
IP0051 # 04 Y:2015 | 04 | 2015 | RECYCLE WHITE WATER | $1,246 | $108 | Implemented |
IP0051 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,713 | $534 | Not Implemented |
IP0051 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,349 | $2,149 | Not Implemented |
IP0051 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $255 | Implemented |
DL0147 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,890 | $32,055 | Not Implemented |
DL0147 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,550 | $9,700 | Not Implemented |
DL0147 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,470 | $21,000 | Implemented |
DL0147 # 03 Y:2015 | 03 | 2015 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $27,680 | $73,960 | Implemented |
MI0279 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $634 | $1,760 | Implemented |
MI0279 # 12 Y:2015 | 12 | 2015 | USE PHOTOCELL CONTROLS | $1,139 | $480 | Implemented |
MI0279 # 11 Y:2015 | 11 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,317 | $3,280 | Not Implemented |
MI0279 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,456 | $1,782 | Not Implemented |
MI0279 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $1,612 | $482 | Implemented |
MI0279 # 08 Y:2015 | 08 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,877 | $2,520 | Implemented |
MI0279 # 06 Y:2015 | 06 | 2015 | USE OPTIMUM THICKNESS INSULATION | $4,666 | $1,810 | Implemented |
MI0279 # 05 Y:2015 | 05 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,141 | $2,100 | Implemented |
MI0279 # 04 Y:2015 | 04 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $11,413 | $12,060 | Implemented |
MI0279 # 03 Y:2015 | 03 | 2015 | RECOVER AND REUSE COOLING WATER | $12,134 | $497 | Implemented |
MI0279 # 02 Y:2015 | 02 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $29,100 | $80,000 | Not Implemented |
MI0279 # 01 Y:2015 | 01 | 2015 | INCREASE EFFICIENCY OF TRUCKS | $30,426 | $29,000 | Not Implemented |