Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0411 # 04 Y:2022 | 04 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,960 | $7,503 | Not Implemented |
MI0411 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,210 | $1,650 | Implemented |
MI0411 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,400 | $630 | Implemented |
MI0411 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $59,622 | $102,900 | Not Implemented |
MI0411 # 08 Y:2022 | 08 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $871 | $1,462 | Not Implemented |
MI0411 # 07 Y:2022 | 07 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,063 | $27,147 | Implemented |
MI0411 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,028 | $0 | Implemented |
MI0411 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,123 | $1,040 | Not Implemented |
DL0211 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,500 | $120,300 | Not Implemented |
DL0211 # 11 Y:2022 | 11 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,347 | $16,607 | Implemented |
DL0211 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,764 | $2,451 | Not Implemented |
DL0211 # 09 Y:2022 | 09 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $28,000 | $61,800 | Not Implemented |
DL0211 # 08 Y:2022 | 08 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,578 | $13,772 | Implemented |
DL0211 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,560 | $28,388 | Not Implemented |
DL0211 # 06 Y:2022 | 06 | 2022 | RECOVER AND REUSE COOLING WATER | $52,650 | $50,000 | Implemented |
DL0211 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,276 | $31,550 | Implemented |
DL0211 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,800 | $600 | Not Implemented |
DL0211 # 02 Y:2022 | 02 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $233 | Not Implemented |
DL0211 # 01 Y:2022 | 01 | 2022 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,080 | $450 | Implemented |
OK1078 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $325 | $0 | Not Implemented |
OK1078 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,608 | $540,200 | Not Implemented |
OK1078 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,663 | $659 | Not Implemented |
OK1078 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,426 | $629 | Not Implemented |
OK1078 # 04 Y:2022 | 04 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,266 | $300 | Not Implemented |
OK1072 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,650 | $0 | Implemented |