IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 312112 Bottled Water Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0332 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $768 $2,041 Implemented
SU0410 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,079 $0 Implemented
SU0410 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $10,482 $0 Implemented
SU0410 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,089 $0 Implemented
SU0410 # 04 Y:2016 04 2016 DISCONNECT BALLASTS $2,567 $0 Implemented
SU0410 # 05 Y:2016 05 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,472 $1,075 Implemented
SU0410 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,989 $6,191 Not Implemented
SU0410 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,702 $18,890 Implemented
SU0410 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,321 $35,838 Implemented
SU0410 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $145 $265 Implemented
SU0410 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $956 Implemented
SU0366 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $368 $0 Not Implemented
SU0366 # 02 Y:2014 02 2014 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $25,532 $4,550 Not Implemented
SU0366 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,414 $2,369 Not Implemented
SU0366 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,336 $762 Not Implemented
SU0366 # 05 Y:2014 05 2014 ELIMINATE/REDUCE AN OPERATION $3,947 $2,284 Not Implemented
SU0366 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,714 $1,131 Not Implemented
TT0129 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $107,559 $235,000 Not Implemented
TT0129 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,620 $2,025 Not Implemented
TT0129 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $3,000 Not Implemented
TT0129 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,882 $3,000 Implemented
LE0298 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $77,015 $56,771 Not Implemented
LE0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,178 $100,000 Implemented
LE0298 # 03 Y:2010 03 2010 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $8,306 $20,000 Not Implemented
LE0298 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,050 $2,440 Implemented