Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
515
matching recommendationsNAICS | 312120 | Breweries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0097 # 04 Y:2017 | 04 | 2017 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $751 | $5,250 | Not Implemented |
BS0097 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $319 | $2,189 | Not Implemented |
BS0097 # 06 Y:2017 | 06 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $3,137 | $60,000 | Not Implemented |
BS0097 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $236 | $131 | Not Implemented |
BS0097 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $212 | $277 | Not Implemented |
BS0097 # 09 Y:2017 | 09 | 2017 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $140 | $160 | Not Implemented |
UU0115 # 01 Y:2017 | 01 | 2017 | DISCONNECT BALLASTS | $296 | $0 | Implemented |
UU0115 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $444 | $438 | Implemented |
UU0115 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $0 | Implemented |
UU0115 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $931 | $2,500 | Not Implemented |
UU0115 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,766 | $0 | Implemented |
OR0682 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $104,297 | $70,000 | Not Implemented |
OR0682 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $4,289 | $23,625 | Not Implemented |
OR0682 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $1,937 | $9,815 | Not Implemented |
OR0678 # 01 Y:2016 | 01 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,885 | $2,948 | Not Implemented |
OR0678 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,663 | $247 | Implemented |
OR0678 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $972 | $2,626 | Implemented |
MZ0210 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,108 | $24,000 | Not Implemented |
MZ0210 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,657 | $3,500 | Implemented |
MZ0210 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $647 | $525 | Implemented |
MZ0210 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $749 | $2,000 | Not Implemented |
MZ0210 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,903 | $1,150 | Implemented |
MZ0210 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $1,100 | $500 | Implemented |
MZ0210 # 07 Y:2016 | 07 | 2016 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $651 | $300 | Implemented |
MZ0210 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $3,340 | $375 | Not Implemented |