IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
Reset
NAICS 31213 Wineries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0450 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,675 $77,383 Not Implemented
SF0450 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,062 $12,000 Not Implemented
SF0450 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $2,563 $11,811 Implemented
LE0358 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,256 $3,010 Not Implemented
LE0358 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,049 $56,100 Not Implemented
LE0358 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,699 $7,698 Not Implemented
LE0358 # 04 Y:2013 04 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,817 $10,056 Not Implemented
LE0358 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $911 $1,000 Not Implemented
LE0358 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,165 $21,900 Not Implemented
LE0358 # 07 Y:2013 07 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $71,337 $190,000 Implemented
LE0358 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,919 $31,422 Implemented
LE0358 # 09 Y:2013 09 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,575 $16,800 Implemented
SF0416 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,478 $0 Implemented
SF0416 # 02 Y:2012 02 2012 COMBINE UTILITY METERS $2,336 $1,600 Not Implemented
SF0416 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,287 $2,705 Not Implemented
SF0416 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,614 $18,273 Implemented
UW0050 # 01 Y:2011 01 2011 PAY BILLS ON TIME TO AVOID LATE FEES $0 $0 Implemented
UW0049 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,931 $67,308 Not Implemented
UW0049 # 02 Y:2011 02 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,443 $7,200 Implemented
UW0049 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $1,300 Implemented
UW0049 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,029 $1,810 Not Implemented
UW0047 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,466 $57,117 Not Implemented
UW0047 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,626 $11,606 Not Implemented
UW0047 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $400 $410 Not Implemented
SF0392 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $541 Implemented