Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
234
matching recommendationsNAICS | 312130 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0609 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,389 | $1,640 | Implemented |
SF0609 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,048 | $1,594 | Implemented |
SF0609 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM THICKNESS INSULATION | $1,473 | $338 | Implemented |
SF0609 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,467 | $66,447 | Implemented |
SF0609 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,617 | $36,367 | Implemented |
SF0609 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,090 | $2,155 | Implemented |
AS0552 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $357 | $10,234 | Implemented |
AS0552 # 06 Y:2023 | 06 | 2023 | SHADE WINDOWS FROM SUMMER SUN | $281 | $550 | Implemented |
AS0552 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,547 | $1,915 | Implemented |
SF0598 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,843 | $8,505 | Implemented |
SF0598 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,883 | $23,100 | Implemented |
SF0598 # 01 Y:2023 | 01 | 2023 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $10,131 | $0 | Implemented |
SF0598 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,805 | $1,551 | Implemented |
SF0596 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,166 | $9,707 | Implemented |
SF0596 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,982 | $4,346 | Implemented |
SF0596 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $1,185 | $2,397 | Implemented |
SF0596 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,903 | $1,551 | Implemented |
IP0166 # 12 Y:2022 | 12 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $665 | Implemented |
IP0166 # 11 Y:2022 | 11 | 2022 | OPTIMIZE PLANT POWER FACTOR | $11,046 | $43,200 | Implemented |
IP0166 # 10 Y:2022 | 10 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $279 | $665 | Implemented |
IP0166 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $198 | $416 | Implemented |
IP0166 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,433 | $1,162 | Implemented |
IP0166 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,625 | $3,274 | Implemented |
IP0166 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $526 | $33 | Implemented |
IP0166 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,623 | $0 | Implemented |