Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 31214 | Distilleries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0601 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $137 | $530 | Implemented |
WV0601 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $514 | $1,425 | Implemented |
WV0601 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $1,509 | $2,170 | Implemented |
WV0601 # 07 Y:2020 | 07 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,303 | $10,560 | Implemented |
WV0601 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,355 | $1,691 | Implemented |
WV0601 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,885 | $13,900 | Implemented |
WV0601 # 04 Y:2020 | 04 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $4,392 | $6,660 | Implemented |
WV0601 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,944 | $3,000 | Implemented |
WV0601 # 02 Y:2020 | 02 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $15,085 | $15,000 | Implemented |
WV0601 # 01 Y:2020 | 01 | 2020 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,050 | $90,000 | Implemented |
UK2004 # 07 Y:2020 | 07 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $102,672 | $4,000 | Implemented |
UK2004 # 09 Y:2020 | 09 | 2020 | OPTIMIZE PLANT POWER FACTOR | $40,258 | $23,660 | Implemented |
UK2004 # 08 Y:2020 | 08 | 2020 | ELIMINATE A BY-PRODUCT | $293,614 | $53,800 | Not Implemented |
UK2004 # 06 Y:2020 | 06 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $71,487 | $150,900 | Implemented |
UK2004 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $52,668 | $24,890 | Implemented |
UK2004 # 04 Y:2020 | 04 | 2020 | INCREASE AMOUNT OF CONDENSATE RETURNED | $360,000 | $250,000 | Implemented |
UK2004 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,067 | $2,630 | Implemented |
UK2004 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,779 | $0 | Implemented |
UK2004 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,031 | $21,360 | Implemented |
UK2003 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $2,200 | Not Implemented |
UK2003 # 07 Y:2020 | 07 | 2020 | MINIMIZE WATER USAGE | $27,840 | $15,000 | Implemented |
UK2003 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $10,287 | $6,825 | Not Implemented |
UK2003 # 05 Y:2020 | 05 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $15,645 | $28,100 | Implemented |
UK2003 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $4,628 | $1,586 | Implemented |
UK2003 # 03 Y:2020 | 03 | 2020 | REDUCE VENTILATION AIR | $5,372 | $4,560 | Not Implemented |