IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
NAICS 312230 Tobacco Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0299 # 03 Y:2016 03 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,688 $320 Implemented
MI0299 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,678 $27,288 Implemented
MI0299 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,745 $5,246 Not Implemented
MI0299 # 02 Y:2016 02 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $10,788 $66,330 Not Implemented
MI0299 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,417 $650 Implemented
MI0299 # 14 Y:2016 14 2016 INSTALL REPLACEMENT DOORS $55 $480 Implemented
MI0299 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,054 $9,821 Implemented
MI0299 # 13 Y:2016 13 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $213 $352 Implemented
MI0299 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $570 $795 Implemented
MI0299 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $776 $480 Implemented
MI0299 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $6,750 Not Implemented
MI0299 # 10 Y:2016 10 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,162 $1,885 Implemented
NC0552 # 04 Y:2015 04 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,541 $30,000 Not Implemented
NC0552 # 10 Y:2015 10 2015 RECOVER WASTE HEAT FROM EQUIPMENT $105,601 $192,000 Not Implemented
NC0552 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,030 $1,000 Implemented
NC0552 # 03 Y:2015 03 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,347 $200,000 Not Implemented
NC0552 # 02 Y:2015 02 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $174,643 $100,000 Not Implemented
NC0552 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,960 $6,000 Not Implemented
NC0552 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,792,252 $500,000 Not Implemented
NC0552 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,081 $320 Implemented
NC0552 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,285 $45,000 Not Implemented
NC0552 # 15 Y:2015 15 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,884 $2,813 Not Implemented
NC0552 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,528 $150 Implemented
NC0552 # 09 Y:2015 09 2015 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $67,578 $150,000 Not Implemented
NC0552 # 14 Y:2015 14 2015 DEVELOP A REPAIR/REPLACE POLICY $20,285 $42,560 Implemented