Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
958
matching recommendationsNAICS | 313 | Textile Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0018 # 02 Y:2008 | 02 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $33,000 | $1,000 | Implemented |
TT0018 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,809 | $22,423 | Implemented |
GT0844 # 01 Y:2007 | 01 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $19,992 | $28,800 | Not Implemented |
GT0844 # 02 Y:2007 | 02 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $35,650 | $40,000 | Not Implemented |
GT0844 # 03 Y:2007 | 03 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $71,952 | $14,867 | Not Implemented |
GT0844 # 04 Y:2007 | 04 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $44,955 | $10,000 | Not Implemented |
GT0844 # 05 Y:2007 | 05 | 2007 | USE SYNTHETIC LUBRICANT | $3,098 | $0 | Not Implemented |
GT0844 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,808 | $5,132 | Not Implemented |
GT0844 # 07 Y:2007 | 07 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,291 | $28,172 | Not Implemented |
GT0844 # 08 Y:2007 | 08 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $65,444 | $81,971 | Not Implemented |
GT0844 # 09 Y:2007 | 09 | 2007 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $323,139 | $174,963 | Implemented |
GT0844 # 10 Y:2007 | 10 | 2007 | INSULATE BARE EQUIPMENT | $10,329 | $19,630 | Not Implemented |
GT0844 # 11 Y:2007 | 11 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $26,394 | $20,000 | Not Implemented |
GT0844 # 12 Y:2007 | 12 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $136,209 | $66,970 | Not Implemented |
GT0844 # 13 Y:2007 | 13 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,869 | $5,000 | Not Implemented |
GT0844 # 14 Y:2007 | 14 | 2007 | INSTALL OCCUPANCY SENSORS | $1,245 | $560 | Not Implemented |
GT0842 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,980 | $1,603 | Implemented |
GT0842 # 02 Y:2007 | 02 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $17,400 | $27,000 | Not Implemented |
GT0842 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,060 | $26,800 | Not Implemented |
GT0842 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $76,200 | $20,000 | Not Implemented |
GT0842 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,090 | $3,900 | Implemented |
GT0842 # 06 Y:2007 | 06 | 2007 | USE WATER-BASED ADHESIVES | $1,960 | $0 | Implemented |
GT0842 # 07 Y:2007 | 07 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $63,520 | $7,000 | Implemented |
GT0842 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,470 | $11,100 | Not Implemented |
MZ0015 # 01 Y:2007 | 01 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $900 | Implemented |