IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 3131 Fiber, Yarn, and Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0514 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,274 $37,000 Not Implemented
LE0514 # 05 Y:2021 05 2021 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $3,549 $13,500 Not Implemented
LE0514 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,301 $19,000 Not Implemented
LE0514 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $1,200 Implemented
LE0514 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,099 $7,600 Implemented
LE0514 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,744 $200 Implemented
LE0450 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,470 Not Implemented
LE0450 # 08 Y:2018 08 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,463 $22,000 Not Implemented
LE0450 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,643 $36,750 Not Implemented
LE0450 # 06 Y:2018 06 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,038 $8,000 Not Implemented
LE0450 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,023 $1,625 Not Implemented
LE0450 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,802 $3,000 Not Implemented
LE0450 # 02 Y:2018 02 2018 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $16,243 $8,000 Not Implemented
LE0450 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,167 $1,000 Not Implemented
LE0192 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $22,723 $5,000 Not Implemented
LE0192 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,219 $0 Implemented
LE0192 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,750 $8,250 Not Implemented
LE0192 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $7,128 $1,084 Implemented
LE0192 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,668 $3,000 Not Implemented
LE0192 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $9,677 $0 Implemented