IAC logo
IAC Assessment: LE0514
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2021
Principal Product Yarn
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 150,000
Annual Production 150,000 Units
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,111 1,228,511 kWh $0.05
Electricity Demand $10,993 3,739 kW-months/year $2.94
Electricity Fees $25,187 - $ -
Fuel Oil #2 $6,128 307 MMBtu $19.96
TOTAL ENERGY COSTS $107,419
RECOMMENDED SAVINGS* $24,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,227
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,744
Cost:
$200
$1,606 30,123 $138 46 - - - - $1,606
30,123
kWh
$138
46
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,099
Cost:
$7,600
$3,704 69,888 $395 134 - - - - $3,704
69,888
kWh
$395
134
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$384
Cost:
$1,200
$346 6,526 $38 13 - - - - $346
6,526
kWh
$38
13
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,301
Cost:
$19,000
$4,569 86,204 $732 249 - - - - $4,569
86,204
kWh
$732
249
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$3,549
Cost:
$13,500
- - - - $196 10 $3,353 - -
-
kWh
-
-
kW-months/year
$196
10
MMBtu
$3,353
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,274
Cost:
$37,000
$7,995 150,858 $1,279 435 - - - - $7,995
150,858
kWh
$1,279
435
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,351
Cost:
$78,500
$18,220 343,599 $2,582 877 $196 10 $3,353 - $18,220
343,599
kWh
$2,582
877
kW-months/year
$196
10
MMBtu
$3,353
-
$
TOTAL IMPLEMENTED Savings:
$6,227
Cost:
$9,000
$5,656 106,537 $571 193 - - - - $5,656
106,537
kWh
$571
193
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost