Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
387
matching recommendationsNAICS | 3132 | Fabric Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0559 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $519 | $27 | n/a |
SU0559 # 01 Y:2024 | 01 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,057 | $0 | n/a |
SU0559 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $662 | $307 | n/a |
SU0559 # 09 Y:2024 | 09 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $175,181 | $421,500 | n/a |
SU0559 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $498 | $27 | n/a |
SU0559 # 07 Y:2024 | 07 | 2024 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $37,111 | $44,118 | n/a |
SU0559 # 08 Y:2024 | 08 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $577 | $888 | n/a |
SU0559 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,926 | $3,523 | n/a |
SU0559 # 10 Y:2024 | 10 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $12,034 | $165,150 | n/a |
SU0559 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,988 | $4,574 | n/a |
GT0970 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,757 | $200 | Implemented |
GT0970 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $268 | $456 | Not Implemented |
GT0970 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,953 | $385,000 | Implemented |
GT0970 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $70,120 | $1,934,090 | Not Implemented |
GT0970 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,613 | $75 | Implemented |
GT0970 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,675 | $1,850 | Implemented |
SU0530 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,193 | $21,150 | Not Implemented |
SU0530 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,131 | $8,940 | Not Implemented |
SU0530 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,551 | $211 | Not Implemented |
SU0530 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $283 | $402 | Not Implemented |
SU0530 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,441 | $6,444 | Not Implemented |
SU0530 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,608 | $1,343 | Not Implemented |
SU0530 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,126 | $28,596 | Not Implemented |
CM1017 # 06 Y:2023 | 06 | 2023 | INSTALL SYSTEM TO COLLECT SCRAP | $9,880 | $2,306 | Not Implemented |
CM1017 # 05 Y:2023 | 05 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,538 | $4,396 | Implemented |