Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3132 | Fabric Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0970 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,757 | $200 | Implemented |
GT0970 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,613 | $75 | Implemented |
GT0970 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,675 | $1,850 | Implemented |
GT0970 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $268 | $456 | Not Implemented |
GT0970 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,953 | $385,000 | Implemented |
GT0970 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $70,120 | $1,934,090 | Not Implemented |
SU0530 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,193 | $21,150 | Not Implemented |
SU0530 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,131 | $8,940 | Not Implemented |
SU0530 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,441 | $6,444 | Not Implemented |
SU0530 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $283 | $402 | Not Implemented |
SU0530 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,608 | $1,343 | Not Implemented |
SU0530 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,551 | $211 | Not Implemented |
SU0530 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,126 | $28,596 | Not Implemented |
CM1017 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $738 | $0 | Implemented |
CM1017 # 07 Y:2023 | 07 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,464 | $3,500 | Implemented |
CM1017 # 06 Y:2023 | 06 | 2023 | INSTALL SYSTEM TO COLLECT SCRAP | $9,880 | $2,306 | Not Implemented |
CM1017 # 05 Y:2023 | 05 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,538 | $4,396 | Implemented |
CM1017 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $20,045 | $41,481 | Implemented |
CM1017 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,890 | $15,750 | Implemented |
CM1017 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,638 | $57,344 | Implemented |
KS2310 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,786 | $5,960 | Not Implemented |
KS2310 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $60 | Not Implemented |
KS2310 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $264 | $236 | Not Implemented |
KS2310 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $4,144 | $13,970 | Not Implemented |
KS2310 # 06 Y:2023 | 06 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $8,217 | $52,431 | Implemented |