IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 31323 Nonwoven Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2508 # 02 Y:2025 02 2025 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $53,908 $84,265 n/a
UL2508 # 01 Y:2025 01 2025 OPTIMIZE PLANT POWER FACTOR $25,350 $14,859 n/a
UL2508 # 05 Y:2025 05 2025 INSTALL SPECTRAL REFLECTORS / DELAMP $141 $0 n/a
UL2508 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,012 $3,773 n/a
UL2508 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $840 n/a
UL2508 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $36,405 $305,296 n/a
UL2508 # 06 Y:2025 06 2025 INSTALL OCCUPANCY SENSORS $55 $237 n/a
UL2508 # 07 Y:2025 07 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,597 $30,000 n/a
UL2508 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,751 $375 n/a
SU0530 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $402 Not Implemented
SU0530 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,126 $28,596 Not Implemented
SU0530 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,551 $211 Not Implemented
SU0530 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,193 $21,150 Not Implemented
SU0530 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,608 $1,343 Not Implemented
SU0530 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,441 $6,444 Not Implemented
SU0530 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,131 $8,940 Not Implemented
KS2310 # 01 Y:2023 01 2023 USE OPTIMUM THICKNESS INSULATION $6,101 $3,005 Implemented
KS2310 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,786 $5,960 Not Implemented
KS2310 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $60 Not Implemented
KS2310 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $264 $236 Not Implemented
KS2310 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $4,144 $13,970 Not Implemented
KS2310 # 06 Y:2023 06 2023 UPGRADE OBSOLETE EQUIPMENT $8,217 $52,431 Implemented
KS2310 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $53,035 $420,746 Not Implemented
KS2202 # 05 Y:2022 05 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $921 $1,582 Not Implemented
KS2202 # 06 Y:2022 06 2022 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,883 $4,387 Implemented