IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 313240 Knit Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0559 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,057 $0 n/a
SU0559 # 10 Y:2024 10 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $12,034 $165,150 n/a
SU0559 # 09 Y:2024 09 2024 USE HEAT PUMP FOR SPACE CONDITIONING $175,181 $421,500 n/a
SU0559 # 08 Y:2024 08 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $577 $888 n/a
SU0559 # 07 Y:2024 07 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $37,111 $44,118 n/a
SU0559 # 06 Y:2024 06 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,988 $4,574 n/a
SU0559 # 05 Y:2024 05 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $5,926 $3,523 n/a
SU0559 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $662 $307 n/a
SU0559 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $498 $27 n/a
SU0559 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $519 $27 n/a
NC0666 # 04 Y:2021 04 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,768 $10,000 n/a
NC0666 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,259 $50 n/a
NC0666 # 02 Y:2021 02 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $24,876 $50,000 n/a
NC0666 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,200 $51,808 n/a
NC0300 # 01 Y:2004 01 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,985 $1,000 Not Implemented
NC0300 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,402 $4,751 Implemented
NC0300 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,688 $6,890 Not Implemented
NC0300 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $9,308 $100 Implemented
NC0300 # 02 Y:2004 02 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,558 $5,000 Implemented