Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2021 |
Principal Product | Knitted goods |
NAICS | 313240 - Knit Fabric Mills |
SIC | 2257 - Weft Knit Fabric Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 39,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $449,000 | 8,589,000 | kWh | $0.05 |
Electricity Demand | $292,852 | 22,725 | kW-months/year | $12.89 |
Natural Gas | $333,057 | 80,714 | MMBtu | $4.13 |
TOTAL ENERGY COSTS | $1,074,909 | |||
RECOMMENDED SAVINGS* | $68,103 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $36,200 Cost: $51,808 |
$23,578 | 450,831 | $12,622 | 979 | - | - | - | - |
$23,578 450,831 kWh |
$12,622 979 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $24,876 Cost: $50,000 |
$16,663 | 318,600 | $8,213 | 637 | - | - | - | - |
$16,663 318,600 kWh |
$8,213 637 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,259 Cost: $50 |
$1,516 | 28,994 | $743 | 58 | - | - | - | - |
$1,516 28,994 kWh |
$743 58 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $4,768 Cost: $10,000 |
- | - | - | - | $4,581 | 1,109 | $187 | 94 |
- - kWh |
- - kW-months/year |
$4,581 1,109 MMBtu |
$187 94 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,103 Cost: $111,858 |
$41,757 | 798,425 | $21,578 | 1,674 | $4,581 | 1,109 | $187 | 94 | $41,757 798,425 kWh |
$21,578 1,674 kW-months/year |
$4,581 1,109 MMBtu |
$187 94 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |