IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 313310 Textile and Fabric Finishing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2434 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $13,772 $52,090 n/a
KS2434 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,889 $6,569 n/a
KS2434 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $6,440 n/a
KS2434 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,512 $73,720 n/a
KS2434 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $48,853 $469,862 n/a
KS2434 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $2,723 $1,383 n/a
NC0658 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,619 $5,000 n/a
NC0658 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $170 $400 n/a
NC0658 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,055 $3,000 n/a
NC0658 # 02 Y:2020 02 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,051 $15,000 n/a
NC0658 # 04 Y:2020 04 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $92,941 $500 n/a
NC0658 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $4,258 n/a
NC0585 # 12 Y:2017 12 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $754 $100 Implemented
NC0585 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $286 $100 Implemented
NC0585 # 11 Y:2017 11 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,207 $100 Implemented
NC0585 # 09 Y:2017 09 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,023 $500 Implemented
NC0585 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $47 $50 Implemented
NC0585 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $100 Implemented
NC0585 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $136 $521 Implemented
NC0585 # 05 Y:2017 05 2017 DISCONNECT BALLASTS $307 $225 Implemented
NC0585 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,989 $500 Implemented
NC0585 # 02 Y:2017 02 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,291 $100 Implemented
NC0585 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,830 $5,000 Implemented
NC0585 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $2,000 Implemented
NC0499 # 08 Y:2013 08 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,104 $200 Not Implemented