IAC logo
IAC Assessment: NC0658
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0658
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product Dyed Goods
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2262 - Finishing Plants, Manmade
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 150,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,460 1,873,849 kWh $0.06
Electricity Demand $105,454 9,719 kW-months/year $10.85
Natural Gas $239,314 52,311 MMBtu $4.57
TOTAL ENERGY COSTS $461,228
RECOMMENDED SAVINGS* $127,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,055
Cost:
$3,000
- - - - $8,055 2,029 - - - - -
-
kWh
-
-
kW-months/year
$8,055
2,029
MMBtu
-
-
Tgal
-
-
$
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$23,051
Cost:
$15,000
- - - - $26,051 6,562 - - $(-3,000) - -
-
kWh
-
-
kW-months/year
$26,051
6,562
MMBtu
-
-
Tgal
$(-3,000)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,619
Cost:
$5,000
$1,063 17,083 $556 51 - - - - - - $1,063
17,083
kWh
$556
51
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$92,941
Cost:
$500
$(-928) (-14,914) $(-485) (-45) - - $94,354 1 - - $(-928)
(-14,914)
kWh
$(-485)
(-45)
kW-months/year
-
-
MMBtu
$94,354
1
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,952
Cost:
$4,258
$1,952 31,383 - - - - - - - - $1,952
31,383
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$170
Cost:
$400
$170 2,730 - - - - - - - - $170
2,730
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$127,788
Cost:
$28,158
$2,257 36,282 $71 6 $34,106 8,591 $94,354 1 $(-3,000) - $2,257
36,282
kWh
$71
6
kW-months/year
$34,106
8,591
MMBtu
$94,354
1
Tgal
$(-3,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Ancillary Material Cost