IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 314 Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2431 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $52,635 $494,620 n/a
KS2431 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $10,405 $31,750 n/a
KS2431 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,895 $154,122 n/a
KS2431 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $37,021 $362,701 n/a
KS2431 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $5,480 n/a
CL1907 # 05 Y:2019 05 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,950 $2,962 Implemented
CL1907 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,280 $131 Implemented
CL1907 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,531 $290 Not Implemented
CL1907 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,969 $31,130 Implemented
CL1907 # 01 Y:2019 01 2019 PAY BILLS ON TIME TO AVOID LATE FEES $4,250 $4,250 Implemented
CL1706 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $66,077 $125,000 Not Implemented
CL1706 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,574 $139,384 Not Implemented
CL1706 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,345 $623 Not Implemented
CL1705 # 01 Y:2017 01 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $148,148 $211,152 Not Implemented
CL1705 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95,734 $244,620 Not Implemented
CL1705 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,929 $3,050 Not Implemented
CL1705 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,097 $900 Not Implemented
GT0796 # 08 Y:2004 08 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $792 $1,910 Not Implemented
GT0796 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,051 $50,551 Implemented
GT0796 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,639 $9,925 Not Implemented
GT0796 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,427 $1,750 Not Implemented
GT0796 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $815 $500 Not Implemented
GT0796 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $835 $0 Implemented
GT0796 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $200 Implemented
GT0796 # 01 Y:2004 01 2004 COMBINE UTILITY METERS $4,508 $9,000 Not Implemented