Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 314 | Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2431 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $52,635 | $494,620 | n/a |
KS2431 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $10,405 | $31,750 | n/a |
KS2431 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,895 | $154,122 | n/a |
KS2431 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,021 | $362,701 | n/a |
KS2431 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,373 | $5,480 | n/a |
CL1907 # 05 Y:2019 | 05 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,950 | $2,962 | Implemented |
CL1907 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,280 | $131 | Implemented |
CL1907 # 03 Y:2019 | 03 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,531 | $290 | Not Implemented |
CL1907 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,969 | $31,130 | Implemented |
CL1907 # 01 Y:2019 | 01 | 2019 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,250 | $4,250 | Implemented |
CL1706 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $66,077 | $125,000 | Not Implemented |
CL1706 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,574 | $139,384 | Not Implemented |
CL1706 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,345 | $623 | Not Implemented |
CL1705 # 01 Y:2017 | 01 | 2017 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $148,148 | $211,152 | Not Implemented |
CL1705 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95,734 | $244,620 | Not Implemented |
CL1705 # 03 Y:2017 | 03 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $15,929 | $3,050 | Not Implemented |
CL1705 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,097 | $900 | Not Implemented |
GT0796 # 08 Y:2004 | 08 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $792 | $1,910 | Not Implemented |
GT0796 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,051 | $50,551 | Implemented |
GT0796 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,639 | $9,925 | Not Implemented |
GT0796 # 05 Y:2004 | 05 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,427 | $1,750 | Not Implemented |
GT0796 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $815 | $500 | Not Implemented |
GT0796 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $835 | $0 | Implemented |
GT0796 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $200 | Implemented |
GT0796 # 01 Y:2004 | 01 | 2004 | COMBINE UTILITY METERS | $4,508 | $9,000 | Not Implemented |