IAC Assessment: GT0796
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0796
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2004
Principal Product Door Mats
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 61
Plant Area (Sq.Ft.) 88,075
Annual Production 11,057 Thousand Feet
Production Hrs. Annual 4,650
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,602 1,753,920 kWh $0.03
Electricity Demand $71,699 4,922 kW-months/year $14.57
Electricity Fees $16,307 - $ -
Natural Gas $91,886 13,052 MMBtu $7.04
TOTAL ENERGY COSTS $225,494
RECOMMENDED SAVINGS* $29,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,781
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$4,508
Cost:
$9,000
- - - - - - $4,508 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,508
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$895
Cost:
$200
$373 14,334 $522 47 - - - - $373
14,334
kWh
$522
47
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$835
Cost:
-
$152 5,838 - - $683 97 - - $152
5,838
kWh
-
-
kW-months/year
$683
97
MMBtu
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$815
Cost:
$500
$548 21,110 - - $267 38 - - $548
21,110
kWh
-
-
kW-months/year
$267
38
MMBtu
-
-
$
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$8,427
Cost:
$1,750
- - - - $8,427 1,197 - - -
-
kWh
-
-
kW-months/year
$8,427
1,197
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,639
Cost:
$9,925
$2,823 108,610 $2,816 350 - - - - $2,823
108,610
kWh
$2,816
350
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,051
Cost:
$50,551
$3,781 145,406 $4,270 375 - - - - $3,781
145,406
kWh
$4,270
375
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$792
Cost:
$1,910
- - - - $792 112 - - -
-
kWh
-
-
kW-months/year
$792
112
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,962
Cost:
$73,836
$7,677 295,298 $7,608 772 $10,169 1,444 $4,508 - $7,677
295,298
kWh
$7,608
772
kW-months/year
$10,169
1,444
MMBtu
$4,508
-
$
TOTAL IMPLEMENTED Savings:
$9,781
Cost:
$50,751
$4,306 165,578 $4,792 422 $683 97 - - $4,306
165,578
kWh
$4,792
422
kW-months/year
$683
97
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes