Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsNAICS | 314 | Textile Product Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $362 | $1,013 | Not Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 03 Y:2009 | 03 | 2009 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $11,003 | $0 | Not Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0784 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $1,600 | $620 | Not Implemented |
OK0784 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,098 | Not Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
WV0393 # 12 Y:2009 | 12 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $419 | $20 | Implemented |
WV0393 # 13 Y:2009 | 13 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $370 | $0 | Implemented |
WV0393 # 11 Y:2009 | 11 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $554 | $56 | Implemented |
WV0393 # 10 Y:2009 | 10 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $220 | Not Implemented |
WV0393 # 02 Y:2009 | 02 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $45,591 | $127,000 | Not Implemented |
WV0393 # 09 Y:2009 | 09 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,723 | $2,067 | Not Implemented |
WV0393 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,009 | $500 | Implemented |
WV0393 # 07 Y:2009 | 07 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,298 | $3,800 | Implemented |
WV0393 # 06 Y:2009 | 06 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,691 | $2,450 | Not Implemented |
WV0393 # 05 Y:2009 | 05 | 2009 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,441 | $7,800 | Not Implemented |
WV0393 # 04 Y:2009 | 04 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,419 | $4,400 | Not Implemented |
WV0393 # 03 Y:2009 | 03 | 2009 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,129 | $2,000 | Implemented |
WV0393 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,642 | $143,500 | Implemented |
MS0341 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,112 | $38,096 | Implemented |
MS0341 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,400 | $196 | Implemented |
MS0341 # 01 Y:2009 | 01 | 2009 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $42,353 | $102,915 | Not Implemented |