IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
NAICS 314999 All Other Miscellaneous Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1907 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,531 $290 Not Implemented
CL1907 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,280 $131 Implemented
CL1907 # 05 Y:2019 05 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,950 $2,962 Implemented
CL1706 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $66,077 $125,000 Not Implemented
CL1706 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,574 $139,384 Not Implemented
CL1706 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,345 $623 Not Implemented
CL1705 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95,734 $244,620 Not Implemented
CL1705 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,097 $900 Not Implemented
CL1705 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,929 $3,050 Not Implemented
CL1705 # 01 Y:2017 01 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $148,148 $211,152 Not Implemented
NC0535 # 05 Y:2015 05 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $214 $188 Not Implemented
NC0535 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,766 $8,146 Not Implemented
NC0535 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,917 $100 Implemented
NC0535 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $917 $200 Not Implemented
NC0535 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,512 $8,000 Not Implemented
NC0535 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $100 Implemented
NC0535 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,975 $1,750 Implemented
NC0535 # 13 Y:2015 13 2015 INSTALL TIMERS AND/OR THERMOSTATS $8,643 $1,000 Not Implemented
NC0535 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $1,846 Not Implemented
NC0535 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $320 Not Implemented
NC0535 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,964 $9,077 Implemented
NC0535 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $667 $2,297 Implemented
NC0535 # 12 Y:2015 12 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $161 $100 Not Implemented
AM0674 # 06 Y:2015 06 2015 INSULATE FEEDWATER TANK $950 $140 Not Implemented
AM0674 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $500 Implemented