Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 31611 | Leather and Hide Tanning and Finishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0510 # 05 Y:2022 | 05 | 2022 | REDUCE VENTILATION AIR | $794 | $383 | Not Implemented |
SU0510 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $717 | $134 | Not Implemented |
SU0510 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $898 | $44 | Not Implemented |
SU0510 # 02 Y:2022 | 02 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $444 | $0 | Not Implemented |
SU0510 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,555 | $0 | Not Implemented |
IC0117 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,880 | $0 | Not Implemented |
IC0117 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $8,404 | Not Implemented |
IC0117 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,256 | $8,992 | Not Implemented |
IC0117 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,574 | $88,643 | Not Implemented |
IC0117 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,442 | $3,500 | Not Implemented |
IC0117 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,809 | $34,020 | Not Implemented |
IC0117 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,057 | $0 | Not Implemented |
IC0117 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $2,100 | Not Implemented |
IC0117 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,541 | $1,690 | Not Implemented |
IC0117 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $103,343 | $192,802 | Not Implemented |
MA0531 # 01 Y:2003 | 01 | 2003 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $31,336 | $37,543 | n/a |
MA0531 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,438 | $43,874 | n/a |
MA0531 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,738 | $6,375 | n/a |
MA0531 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $2,667 | $4,205 | n/a |
MA0531 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,532 | $6,800 | n/a |
MA0531 # 06 Y:2003 | 06 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $445 | $383 | n/a |