Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsNAICS | 3211 | Sawmills and Wood Preservation |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0302 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $938 | $156 | Implemented |
MS0302 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,297 | $5,159 | Implemented |
MS0302 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,406 | $0 | Implemented |
MS0302 # 01 Y:2006 | 01 | 2006 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $843,874 | $1,350,000 | Not Implemented |
MS0302 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,236 | $21,060 | Implemented |
MS0302 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,643 | $6,087 | Implemented |
OR0502 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,300 | $6,300 | Implemented |
OR0502 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $12,600 | $48,600 | Implemented |
OR0502 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,300 | $27,500 | Implemented |
OR0502 # 01 Y:2006 | 01 | 2006 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $5,052,000 | $0 | Not Implemented |
OR0502 # 02 Y:2006 | 02 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,700 | $0 | Implemented |
OR0502 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,280 | $72,900 | Implemented |
AS0424 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $6,478 | $800 | n/a |
AS0424 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,909 | $2,240 | n/a |
AS0424 # 02 Y:2006 | 02 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,125 | $44,393 | n/a |
AS0424 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,418 | $1,000 | n/a |
UF0381 # 03 Y:2006 | 03 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,105 | $4,018 | Not Implemented |
UF0381 # 09 Y:2006 | 09 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,919 | $0 | Implemented |
UF0381 # 10 Y:2006 | 10 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,495 | $8,880 | Implemented |
UF0381 # 01 Y:2006 | 01 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,568 | $0 | Not Implemented |
UF0381 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $721 | $0 | Not Implemented |
UF0381 # 08 Y:2006 | 08 | 2006 | ELIMINATE A BY-PRODUCT | $278 | $32 | Implemented |
UF0381 # 07 Y:2006 | 07 | 2006 | UPGRADE OBSOLETE EQUIPMENT | $21,240 | $43,000 | Implemented |
UF0381 # 02 Y:2006 | 02 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $4,916 | $715 | Implemented |
UF0381 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,069 | $5,892 | Not Implemented |