IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

708

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3031 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,389 $7,400 Implemented
UA3031 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,045 $23,550 Implemented
UA3031 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $174 $3,355 Not Implemented
UA3031 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $85 $609 Not Implemented
UA3031 # 06 Y:2013 06 2013 MODIFY STARTUP/SHUTDOWN TIMES $15,087 $0 Not Implemented
UA3031 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,270 $1,654 Implemented
UA3031 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,244 $4,074 Implemented
UA3031 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $362 $763 Not Implemented
OR0612 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $30,841 $79,939 Not Implemented
OR0612 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,184 $10,125 Implemented
OR0612 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $7,387 $13,420 Implemented
OR0612 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,981 $4,470 Not Implemented
OR0612 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $922 Implemented
OR0607 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,535 $27,268 Not Implemented
OR0607 # 02 Y:2013 02 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,626 $5,352 Not Implemented
OR0607 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $3,603 $9,150 Not Implemented
OR0607 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,983 $7,504 Implemented
OR0607 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,021 $5,130 Implemented
OR0602 # 01 Y:2013 01 2013 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $199,441 $59,312 Implemented
OR0602 # 02 Y:2013 02 2013 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $17,131 $45,000 Not Implemented
OR0602 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $14,855 $19,467 Implemented
OR0602 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $5,434 $10,283 Implemented
OR0602 # 05 Y:2013 05 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,904 $4,472 Not Implemented
OR0602 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $3,822 $9,150 Implemented
OR0602 # 07 Y:2013 07 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,173 $2,020 Not Implemented