IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 321114 Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0728 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $8,480 $5,420 Implemented
AM0728 # 03 Y:2017 03 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,700 $4,000 Implemented
AM0728 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,530 $1,000 Implemented
AM0728 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $2,740 $140 Implemented
AM0728 # 06 Y:2017 06 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,100 $1,070 Implemented
AM0728 # 07 Y:2017 07 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,250 $1,000 Implemented
AM0728 # 08 Y:2017 08 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,310 $4,370 Implemented
AM0728 # 09 Y:2017 09 2017 PAY UTILITY BILLS ON TIME $676 $0 Implemented
AM0728 # 10 Y:2017 10 2017 USE SYNTHETIC LUBRICANT $386 $0 Implemented
AM0728 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,680 $20,300 Implemented
OR0676 # 03 Y:2016 03 2016 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $216,607 $80,000 Implemented
OR0676 # 05 Y:2016 05 2016 ADD AREA LIGHTING SWITCHES $1,356 $1,062 Implemented
OR0676 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $2,884 $6,584 Implemented
OR0676 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,774 $7,200 Implemented
OR0676 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,742 $0 Not Implemented
OR0676 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,729 $6,828 Not Implemented
SU0415 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,422 $27,505 Implemented
SU0415 # 04 Y:2016 04 2016 REPLACE BOILER $5,067 $23,111 Implemented
SU0415 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $157 Implemented
SU0415 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $0 Not Implemented
UA0132 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,665 $10,900 Not Implemented
UA0132 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $4,189 $1,583 Implemented
UA0132 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,414 $0 Not Implemented
UA0132 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,531 $10,336 Not Implemented
UA0132 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,943 $13,395 Not Implemented